Military Shelters, Deployable Facilities & Containerized Solutions for Defense

Deployable Containerised Solutions to Support Royal NavyPODS Delivered

G3 Systems has delivered four deployable containerised solutions to support the Royal NavyPODS (Persistent Operational Deployable Systems) for heavy-lift drones in record time By Sarah Simpson / 21 Sep 2022
Deployable Containerised Solutions by G3 Systems
Follow DA

G3 Systems Limited, working with QinetiQ, has delivered in a record time of 12 weeks, four deployable containerised solutions to support the Royal Navy Persistent Operational Deployable Systems (NavyPODS), required to transport and control the new heavy-lift drone capability.

NavyPODS are interchangeable modules that can be fitted to the surface fleet. Using a shipping container as the transport medium, NavyPODS deliver the concept of a ‘plug and play’ warship and enable Royal Navy ships of all sizes to be more adaptable and versatile when deployed.

By combining NavyPODS and surface platforms, greater operational effect will be achieved by being interchangeable, interconnected and integrated, allowing the Royal Navy to rapidly respond to a variety of taskings. The heavy-lift drone capability is a key building block of this concept and G3 Systems provided the deployable containerised solution to transport, control and maintain these drones.

Deployable Containerised Solutions to Support Royal NavyPODS Delivered

G3 Systems have vast experience and expertise in designing, building and supporting high specification, bespoke, deployable containerised solutions. This project required all the ingenuity, agility and purpose G3 Systems are famous for, to work closely with the customer, QinetiQ and various suppliers to integrate the rapidly changing requirements and still deliver against short timelines.

A normal project of this scale would take 16 to 20 weeks, but by drawing on past experience, standardized proven solutions and the knowledge gained during the Royal Navy Forward Support Units (FSU) refurbishment programme, it was possible to deliver all four systems with three separate designs within 12 weeks, which is a new record for G3 Systems on such a complex project.

Mike Puckett, Managing Director at G3 Systems Limited said, “We are very pleased with the outcome of this exciting project with the Royal Navy. Over 20 years we have become experts in designing and building complex containerised solutions, and the Royal Navy has seized on this concept for both FSUs and PODs to maximize their flexibility and response time. I am very proud of the G3 team that we were able to mirror this concept and deliver a high-quality sustainable, flexible product in record time.”

G3 Systems will be available at DVD 22 to discuss this project, and all their capabilities, on stand C4-401, at UTAC Millbrook, Bedfordshire 21/22 September 2022.

To learn more, contact G3 Systems: Visit Website Send Message View Supplier Profile
Posted by Sarah Simpson Connect & Contact
More from G3 Systems