Roll-Out of First LEGUAN Bridge Laying System for Norway
Krauss-Maffei Wegmann’s LEOPARD 2-based LEGUAN bridge laying system is capable of transporting and laying one bridge in the military load class 80 (about 72 tons) with a length of 26 meters, or two bridges with a length of 14 meters each





